The provided maps illustrate the transformation of a college campus from 2006 to the present day. Overall, the site has experienced substantial development, characterised by the addition of new buildings and a more complex network of pathways.
In 2006, the layout was relatively simple, featuring two college buildings, a library, a sports field, and a car park, all connected by a single path. The area was sparsely populated with trees, particularly in the top and bottom left sections. By the present day, the campus has been significantly redeveloped. A central cafeteria has been constructed, serving as a hub with multiple paths radiating outwards. Furthermore, a bus stop has been installed along the top road, and a new bike storage facility has been added adjacent to the car park.
Regarding the existing structures, the library and college building 1 have been relocated to the bottom of the site. Additionally, a sports centre has been built between the car park and the sports field. While the trees in the top left remain, the overall density of the campus has increased, reflecting a shift towards a more integrated and facility-rich environment.