PTE · Describe Image

Modern Container Port Operations: PTE Describe Image practice questions

4 original Describe Image questions. Question 1 is free to record, play back and compare with a sample answer right here; log in free to practise the rest in the BandLadder app.
  • 4 questions
  • Question 1 free, no login
  • PTE Academic and PTE Core
1

Quayside Crane Productivity

Free to try, no login

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Average Container Moves per Hour by Crane Type (moves per hour). Standard Vessel: Manual Gantry 24, Semi-Automated 30, Dual-Trolley 36, Remote-Controlled 33. Ultra-Large Vessel: Manual Gantry 20, Semi-Automated 27, Dual-Trolley 42, Remote-Controlled 38.

Average Container Moves per Hour by Crane Type (moves per hour)
01020304050Manual GantrySemi-AutomatedDual-TrolleyRemote-Controlled
  • Standard Vessel
  • Ultra-Large Vessel
View the data
Manual GantrySemi-AutomatedDual-TrolleyRemote-Controlled
Standard Vessel24303633
Ultra-Large Vessel20274238

Your recording stays in this browser: it is not uploaded or stored.

Questions 2–4

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Read them here; log in to answer and check them.

2

Customs Inspection Workflow

Inbound Container Clearance Sequence. Stage 1: Discharge from vessel to yard. Stage 2: Automated manifest risk screening. Stage 3: Non-intrusive radiological scanning. Stage 4: Targeted physical inspection. Stage 5: Documentation clearance and gate exit.

Inbound Container Clearance Sequence
  1. 1.Discharge from vessel to yard
  2. 2.Automated manifest risk screening
  3. 3.Non-intrusive radiological scanning
  4. 4.Targeted physical inspection
  5. 5.Documentation clearance and gate exit
3

Reefer Energy Consumption Breakdown

Port Terminal Electricity Usage by Subsystem (%). Refrigerated Container Stacks 44, Quayside Gantry Cranes 26, Yard Stacking Equipment 15, High-Mast Yard Lighting 10, Terminal Buildings 5.

Port Terminal Electricity Usage by Subsystem (%)
  • Refrigerated Container Stacks: 44%
  • Quayside Gantry Cranes: 26%
  • Yard Stacking Equipment: 15%
  • High-Mast Yard Lighting: 10%
  • Terminal Buildings: 5%
View the data
CategoryValue (%)
Refrigerated Container Stacks44
Quayside Gantry Cranes26
Yard Stacking Equipment15
High-Mast Yard Lighting10
Terminal Buildings5
4

Terminal Turnaround Times

Average Dwell and Gate Times by Freight Type. Columns: Cargo Category, Yard Dwell Time (Days), Gate Processing (Mins), Inspection Rate (%). Standard Dry, 3.8, 22, 4. Hazardous Goods, 2.1, 48, 18. Refrigerated, 2.6, 31, 12. Over-Dimensional, 5.4, 55, 25.

Average Dwell and Gate Times by Freight Type
Cargo CategoryYard Dwell Time (Days)Gate Processing (Mins)Inspection Rate (%)
Standard Dry3.8224
Hazardous Goods2.14818
Refrigerated2.63112
Over-Dimensional5.45525

Want to answer the other 3?

Log in to practise Describe Image in the BandLadder app: the full question bank, with an AI score from BandLadder AI for content, pronunciation and oral fluency on a free account.

Ready for the whole test?

Take a full PTE mock with every question type, the real timings and a score on Pearson's 10–90 scale the moment you finish.

Try a free PTE mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Instant scoring, marked the way Pearson does
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy

Log in to practise all 4