PTE · Describe Image

Landscape Design of Modern Cemeteries: PTE Describe Image practice questions

4 original Describe Image questions. Question 1 is free to record, play back and compare with a sample answer right here; log in free to practise the rest in the BandLadder app.
  • 4 questions
  • Question 1 free, no login
  • PTE Academic and PTE Core
1

Cemetery Circulation Network Plan

Free to try, no login

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Master Layout of Memorial Grounds, north at the top. Main Entrance & Reception in the north-west, Ceremonial Courtyard in the north, Administrative Offices in the north-east, Central Pathway Axis in the south, Lawn Burial Sectors in the south-west, Quiet Reflection Garden in the south-east.

Master Layout of Memorial Grounds
Main Entrance &ReceptionCeremonialCourtyardAdministrativeOfficesCentralPathwayAxisLawn Burial SectorsQuiet ReflectionGardenN

Your recording stays in this browser: it is not uploaded or stored.

Questions 2–4

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Read them here; log in to answer and check them.

2

Memorial Park Land Allocation

Land Surface Allocation in Contemporary Cemeteries (%). Traditional Burial Plots 35, Woodland & Conservation 25, Pedestrian Paths & Roads 15, Water Features & Basins 15, Service Buildings 10.

Land Surface Allocation in Contemporary Cemeteries (%)
  • Traditional Burial Plots: 35%
  • Woodland & Conservation: 25%
  • Pedestrian Paths & Roads: 15%
  • Water Features & Basins: 15%
  • Service Buildings: 10%
View the data
CategoryValue (%)
Traditional Burial Plots35
Woodland & Conservation25
Pedestrian Paths & Roads15
Water Features & Basins15
Service Buildings10
3

Pathway Material Performance Metrics

Cemetery Walkway Material Durability and Permeability. Columns: Material Type, Permeability Rating, Lifespan (Years), Maintenance Need. Stabilised Gravel, High, 8, Frequent. Porous Asphalt, Moderate, 15, Low. Granite Pavers, Low, 40, Minimal. Compacted Earth, High, 4, Very Frequent.

Cemetery Walkway Material Durability and Permeability
Material TypePermeability RatingLifespan (Years)Maintenance Need
Stabilised GravelHigh8Frequent
Porous AsphaltModerate15Low
Granite PaversLow40Minimal
Compacted EarthHigh4Very Frequent
4

Sustainable Cemetery Conversion Sequence

Phases of Sustainable Cemetery Redevelopment. Stage 1: Topographical and Soil Drainage Assessment. Stage 2: Zoning of Dedicated Ecological Sectors. Stage 3: Installation of Permeable Access Trails. Stage 4: Planting of Indigenous Canopy Trees. Stage 5: Integration of Low-Profile Boundary Markers.

Phases of Sustainable Cemetery Redevelopment
  1. 1.Topographical and Soil Drainage Assessment
  2. 2.Zoning of Dedicated Ecological Sectors
  3. 3.Installation of Permeable Access Trails
  4. 4.Planting of Indigenous Canopy Trees
  5. 5.Integration of Low-Profile Boundary Markers

Want to answer the other 3?

Log in to practise Describe Image in the BandLadder app: the full question bank, with an AI score from BandLadder AI for content, pronunciation and oral fluency on a free account.

Ready for the whole test?

Take a full PTE mock with every question type, the real timings and a score on Pearson's 10–90 scale the moment you finish.

Try a free PTE mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Instant scoring, marked the way Pearson does
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy

Log in to practise all 4