PTE · Describe Image

Subterranean Tunnel Construction: PTE Describe Image practice questions

4 original Describe Image questions. Question 1 is free to record, play back and compare with a sample answer right here; log in free to practise the rest in the BandLadder app.
  • 4 questions
  • Question 1 free, no login
  • PTE Academic and PTE Core
1

Mountain Highway Tunnel Methods

Free to try, no login

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Average Excavation Speed by Geological Condition (Metres per day). Drill and Blast: Soft Silt 3, Fractured Shale 6, Solid Granite 9, Mixed Gravel 4. Roadheader Excavation: Soft Silt 8, Fractured Shale 11, Solid Granite 2, Mixed Gravel 6.

Average Excavation Speed by Geological Condition (Metres per day)
048121620Soft SiltFractured ShaleSolid GraniteMixed Gravel
  • Drill and Blast
  • Roadheader Excavation
View the data
Soft SiltFractured ShaleSolid GraniteMixed Gravel
Drill and Blast3694
Roadheader Excavation81126

Your recording stays in this browser: it is not uploaded or stored.

Questions 2–4

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Read them here; log in to answer and check them.

2

Alpine Tunnel Air Quality

Carbon Monoxide Levels Along Tunnel Length (Parts per million). Natural Draft: Portal Entry 5, 2 km 18, 4 km 32, 6 km 45, 8 km 38, 10 km 22, Portal Exit 6. Forced Ventilation: Portal Entry 4, 2 km 8, 4 km 12, 6 km 15, 8 km 14, 10 km 9, Portal Exit 5.

Carbon Monoxide Levels Along Tunnel Length (Parts per million)
01020304050Portal Entry2 km4 km6 km8 km10 kmPortal Exit
  • Natural Draft
  • Forced Ventilation
View the data
Portal Entry2 km4 km6 km8 km10 kmPortal Exit
Natural Draft518324538226
Forced Ventilation4812151495
3

Ground Freezing Support Stages

Artificial Ground Freezing Procedure. Stage 1: Drill perimeter freeze holes. Stage 2: Circulate chilled brine coolant. Stage 3: Form continuous ice wall. Stage 4: Excavate unstable waterlogged ground. Stage 5: Install permanent cast concrete lining. Stage 6: Decommission freeze plant and thaw.

Artificial Ground Freezing Procedure
  1. 1.Drill perimeter freeze holes
  2. 2.Circulate chilled brine coolant
  3. 3.Form continuous ice wall
  4. 4.Excavate unstable waterlogged ground
  5. 5.Install permanent cast concrete lining
  6. 6.Decommission freeze plant and thaw
4

Shaft Site Logistic Layout

Excavation Shaft Surface Logistics Compound, north at the top. Access Gate in the north-west, Grout Plant in the north, Spoil Holding Bay in the north-east, Main Launch Shaft in the centre, Precast Segment Yard in the south-west, Power Substation in the south-east.

Excavation Shaft Surface Logistics Compound
Access GateGrout PlantSpoil HoldingBayMain Launch ShaftPrecastSegment YardPowerSubstationN

Want to answer the other 3?

Log in to practise Describe Image in the BandLadder app: the full question bank, with an AI score from BandLadder AI for content, pronunciation and oral fluency on a free account.

Ready for the whole test?

Take a full PTE mock with every question type, the real timings and a score on Pearson's 10–90 scale the moment you finish.

Try a free PTE mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Instant scoring, marked the way Pearson does
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy